Vasilikos Power Station - Vasiliko, Cyprus

• Combined Cycle GT Unit No 5, 2+1 configuration, 220 MW (dual fuel GTs)

Period of execution: 2010-2013

• Combined Cycle GT Unit No 4, 2+1 configuration, 220 MW (dual fuel GTs)  

Period of execution:  2006-2009

• Steam turbine unit 130 MW (HFO fired boiler)

Period of execution: 2004-2005

• Steam turbine units 2×130 MW (HFO fired boilers)

Period of execution: 1998-2000

Heron II Power Station - Viotia, Greece

• Effluents treatment unit

Period of execution: 2012

Megalopolis Power Station - Arcadia, Greece

• Combined Cycle GT Unit No5, 2+1 configuration, 811 MW

Period of execution: 2011 – (In progress)

• Flue Gas Desulfurization Plant at the lignite fired Unit No 4

Period of execution: 1997-1998

• Lignite Fired Unit No 4, 300 MW

Period of execution : 1987 – 1993

ELPE refinery - Thessaloniki, Greece

• Refinery upgrading project – 1400 Naphtha reformer

Period of execution : 2009

 • Combined Cycle Power Station 390 MW, 1+1 configuration (dual fuel fired GT)

Period of execution: 2004-2005

 • Polypropylene plant with 176 Ktons annual capacity

Period of execution: 2000-2001

Komotini Power Station - Rodopi, Greece

• Combined Cycle Power Station 485 MW, 2+1 configuration (dual fuel GTs)

Period of execution : 2000-2001

Revithousa LNG terminal - Megara gulf, Greece

• LNG terminal at Revithousa island

Period of execution: 1998-1999

Chania Power Station - Crete, Greece

• Gas Turbine Units 2x67MW and BoP installations

 Period of execution : 1997-1998

Lavrion Power Station - Attica, Greece

•  Combined Cycle Power Station 550 MW, 3+1 configuration (dual fuel fired GT)                                                            

 Period of execution: 1997-1998

•  Combined Cycle GT Unit 173 MW, 2+1 configuration (dual fuel fired GT)                                                                          

 Period of execution : 1993-1995

Keratsini Power Station - Attica, Greece

• Boiler conversion from HFO fired to fuel gas fired type

Period of execution: 1997-1998

Violex BIC factory - Attica, Greece

• New factory of Violex BIC for blade shavers production

Period of execution: 1997

Ptolemaida Power Station - Kozani, Greece

• Lignite Fired Unit No 4, 300 MW, conversion of the bottom ash handling system from wet/quenching to dry type

Period of execution : 1994-1995

Aghios Demetrios Power Station - Kozani, Greece

• Lignite Fired Unit No 5, 350 MWe + 70 MWth.

Period of execution : 1995 & 1996

• Modification of Units No 3&4 and equipment installation for Kozani district heating system 67 MWth.

Period of execution : 1994 & 1996

Amynteon Power Station - Kozani, Greece

• Lignite fired Units No 1&2, 2×310 MW

Period of execution : 1982-1987

Elpedison Power Station - Viotia, Greece

• Preventive and corrective maintenance, repair and modification works

Period of execution: 2010 – (In progress)

• Repair / balaning / alignment of condensate and feed water pumps

Period of execution:2013

Heron II Power Station - Viotia, Greece

• Repair and alignment of fin fan coolers and ACC

• Preventive and corrective maintenance, repair and modification works

Period of execution: 2010- (In progress)

Dhekelia Power Station - Larnaca, Cyprus

• Materials procurement, fabrication of pressure parts and replacement of superheater III coins and suspension tubes of boilers No5 & No6

Period of execution: 2010

• Materials procurement, fabrication of pressure parts and replacement of superheater III coils and suspension tubes of boiler No 4

Period of execution: 2006  

 • Materials procurement, fabrication of pressure parts and replacement of superheater III coils, Economizer coils and suspension tubes of boiler No 3

Period of execution: 2005

• Materials procurement, fabrication of pressure parts and replacement of superheater III coils, Economizer coils and suspension tubes of boiler  No 1

Period of execution: 2003-2004

• Materials procurement, fabrication of pressure parts and replacement of superheater III coils and suspension tubes of boiler  No 2

Period of execution: 2002

Megalopolis Power Station - Arcadia, Greece

• Repair of hydrogen seal / oil deflector of Stream Turbine Generator  at Unit V

Period of execution: 2013

• Field machining of Steam Turbine LP diaphragm at Unit V

Period of execution: 2012

Aghioi Theodoroi Power Station - Korinthos, Greece

• Rewinding, rectification & balancing of lube oil pump motors and oil vapor extractors

Period of execution: 2012

Komotini Power Station - Rodopi, Greece

• Reconstruction of Stream Turbine Generator rotor and rectification works in stator’s end windings

Period of execution: 2012

• Complete rewinding of Gas Turbine Generator No11

Period of execution: 2012

Linoperamata Power Station - Crete, Greece

• Materials procurement, fabrication of pressure parts and replacement of superheater I coils of boilers No2 & No3

Period of execution: 2012

Kardia Power Station - Kozani, Greece

• Electrostatic precipitators upgrade of lignite fired boiler Unit No1

Period of execution:2012

Moni Power Station - Limassol, Cyprus

• Steam turbine and boilers repair works of Units No1 & No3

Period of execution: 2005

• Repair of admission valve chest of Steam Turbine Units No2 & No4

Period of execution: 2003

Return to top of page